BEFORE: the cracked red cement, dirty white walls, lights dangling from wires, clutter |
Right now, I am trying to push through the remaining projects:
The one's done in the last 2 weeks are....
The one's done in the last 2 weeks are....
* Curtains: DONE
* Door locks changed: DONE
* Ramps re-done to fit the new floor height: DONE
* Grab bar by the toilet installed: DONE
* Door cut down to meet the new floor height: DONE
* Leak in the sink fixed: DONE
* Custom table built and painted: DONE
BEFORE: The back room (AFTER I moved out the junk stacked floor to ceiling) |
BEFORE: Adult height urinals |
BEFORE: The original double sink in the bathroom |
NOW....today...I had planned to have 4 contractors here to do the following:
* Install the heavy duty anchor through the roof for the sensory swing and then waterproof over this
* Install the 3 heavy mirrors
* Re-set the door that was removed as the hinges do not match up
* Replace the front door flap/latch to prevent the kids from crawling through the hole into the PT room
* Installing the wood portion of my custom table top
* Installing the replacement lock for the door to the ramp (that the tile guy threw away)
* Drilling a hole in the 2 metal plates for the ceiling anchor
AFTER: The new tile; light fixtures; mural and soft paint; windows painted to match the mural |
AFTER: The curtains! |
OK...they were ALL supposed to be here at 10 AM...it is near 2 PM and only 1 of the 4 showed up. I am trying not to get frustrated...I need to pick up the equipment from Katalemwa next week and need all this done before then. Today, I am not coping well.
AFTER: Robert installing the grab bar by the toilet |
AFTER: Alfred painting the custom adjustable table |
AFTER: Godfrey posing with his custom table |
AFTER: The lowered urinals for the boys with grab bars |
I know I need to trust that God will do this on HIS time....I decided it was a good time as a result to catch up on the blog. Trust...not an easy thing for me...this is probably one of many, many more lessons I will need to go through. UGH.
AFTER: the single sink; newly painted frames and the railing on the ramp |
AFTER: The adjusted ramp height with railings |
AFTER: The door that doubles as a railing; the new sink in the gym |
AFTER: The pretty blue green back room with mirrors waiting to be hung |
Well...it worked...I am fully in the HUMAN mode today!
Good job Carol. I may be coming to volunteer in September and I have a few questions. Would you mind emailing me? loganpatricia84@yahoo.com
ReplyDelete